A model of a house should be built like a house — just smaller.

Built, not printed

No resin shells, no laser-cut kit of parts. We pour a slab, stand a frame, and clad it board by board.

Fixed price, six weeks

We quote from your drawings or photographs, and the number on that quote is the number you pay.

Made to be photographed

Detail resolves under a macro lens at eye level, because that is where most of these end up being shot.

Models

Three scales. Any house you like.

1:24 · 14 in long

Alder

Our smallest commission. Poured slab, full stick frame, milled siding, and a single warm circuit behind the glazing.

Capacity
Sits on a shelf
Price
from $2,400
1:18 · 19 in long

Birch

The one most people order. Room-by-room lighting, an openable front door, and interior partitions you can see through the windows.

Capacity
Sits on a desk
Price
from $3,900
1:12 · 27 in long

Cedar

Dollhouse scale, built to architectural tolerances. A lift-off roof, a finished interior, and photographic detail down to the gutter brackets.

Capacity
Sits on a workbench
Price
from $6,800

Specification

The parts buried inside it.

Standard at every scale. Where your house needs something we don't normally build, it's written into the quote before you sign.

Foundation
Cast fine-aggregate concrete over hand-tied steel rebar
Framing
Milled basswood studs at scale 16" OC, real headers and trusses
Electrical
12 V LED, room-by-room circuits, switch hidden in the plinth
Cladding
Individually milled lap boards, laid course by course
Roofing
Hand-folded standing-seam aluminium, drip edge and gutters
Glazing
Laser-cut frames, real glass, opening front door
Base
Solid white oak plinth, felted, with a routed cable channel
Finish
Hand-aged, UV-stable — it will not yellow on a sunlit shelf

Process

Six weeks, drawings to crate.

  1. Week 0Reference and drawings. Photos, plans, or a sketch on a napkin.
  2. Week 1Rebar tied and the slab poured. It cures while we mill stock.
  3. Week 2Framing stood, openings headed, trusses set on the ridge.
  4. Week 3Electrical rough-in. Every circuit tested before anything closes.
  5. Week 4–5Siding, glazing, then roofing. The shell goes weathertight.
  6. Week 6Landscaping, plinth, final photographs, and a padded crate.

Start a build

Tell us about the house.

We take on about forty commissions a year. Send drawings, photographs, or a rough sketch — all three work equally well.